Skip to main content Skip to footer

Location

Twickenham Stadium


Project

East Stand refurbishment

Year

2018

Product

Shingles

Material

3000-series aluminium / stainless steel

Finish

Pre-coated aluminium

Gilmours manufactured the aluminium shingle cladding package for the refurbishment of Twickenham Stadium’s East Stand. The project required approximately 10,000kg of 1mm-thick, 3000-series pre-coated aluminium, with the complexity of the façade requiring each shingle variation to be individually modelled and detailed to suit the building.

Manufactured in-house, six coils of aluminium were de-coiled to length, profiled to shape and press-braked to form the interlocking hems. Gilmours also fabricated the starter bars and fixing clips in stainless steel. Careful protected processing was essential throughout manufacture to preserve the pre-coated finish and enable efficient installation on site.

Let's have a chat

Tell us a little about what you need and our team will be in touch.

Project Services

Design to
Manufacture

Painting
+ Finishing

Fabrication

Pressing

Assembly

Bonding